The cement work on both pads is now complete. The first ten 2,500-liter water tanks have arrived at the Maya Jaguar campus and are ready to be installed. All of the required PVC piping and materials for the roofs has been ordered.


Installation is expected to be complete by March 20.

Tanks enroute to the campus - the final portion of the trip is done with the smaller Land Cruisers four at a time

Tanks enroute to the campus - the final portion of the trip is done with the smaller Land Cruisers four at a time

Tanks on campus

Tanks on campus

Second pad ready for tank installation

Second pad ready for tank installation

When complete, the project will consist of two concrete, roofed pads that will hold 12 and 18 tanks, adding a total of 75,000 liters (almost 20,000 gallons) of rainwater storage.


This is part of a Rotary International Global Grant and a volunteer effort by the

Hands for Peacemaking Foundation.


Thank you Rotary International Rotary Club of Everett Port Gardner Aspect Consulting Adopt-a-Village in Guatemala South Jordan Rotary Club Brigham City Rotary Club Farmington Utah Rotary #heartofguatemala 